Vinh - Cua Lo Avenue Phase 2 was approved by the Provincial People's Committee under Decision No. 4686/QD-UBND on December 2, 2021. With a total length of 10.8 km passing through three localities: Vinh City (3.4 km), Nghi Loc District (4.8 km), and Cua Lo Town (2.6 km), this is a crucial route in Nghe An connecting Vinh City with Cua Lo Town and is currently the largest road in Nghe An. Photo: Xuan Hoang The starting point of the project is at Km0, intersecting with Truong Van Linh Street in Vinh City, and the endpoint is at Km10+800, intersecting with Binh Minh Street in Cua Lo Town. The total investment for the project is 1,415 billion VND. In the photo: The section from Km9+680 to Km10+832 has a main road width of 16 meters on each side, including 4 lanes; a median strip of 22 meters wide; and sidewalks 9 meters wide on each side. Photo: Xuan Hoang The endpoint of the project intersects with Binh Minh Street in Cua Lo Town, leading to the sea, which is now essentially completed. Photo: Xuan Hoang In early August, a consortium of contractors mobilized all their workforce and machinery to ensure the project stayed on schedule. According to the Department of Transport of Nghe An, as of early August 2024, the construction progress of this project has reached over 90%. Photo: Quang An Currently, the contractor is focusing on completing the asphalt concrete pavement, finishing the sidewalks, laying stones, and planting trees. Photo: Quang An Additionally, the lighting system and traffic safety features on the route are also in the final stages of construction. Photo: Quang An Despite the intense heat in recent days, workers have persevered, staying on site to bring the project to completion on time. Photo: Quang An The traffic light system at the project's starting point, the intersection with Truong Van Linh Street, has been installed. Photo: Quang An After Phase 1 of Vinh - Cua Lo Avenue was completed, residents traveling from Vinh City to Cua Lo used the service roads on both sides, each 9 meters wide with 2 lanes. According to the Department of Transport, Vinh - Cua Lo Avenue Phase 2 is expected to open by August 15, with a main road width of 16 meters on each side, including 4 lanes, reducing congestion and enhancing the urban landscape of Vinh City in the future. Photo: Quang An
Quang An - Xuan Hoang